Installation methods Depending on the individual application, the PHS may be installed in different patterns. 7 steps to complete your installation The sensors are installed by qualified roofers, plumbers, or carpenters. Develop an installation scheme: distribute sensors evenly across the entire surface to be monitored Prepare the subfloor: subfloor must be dry and swept clean Lay out the sensor paths according to the installation scheme (no specialised tools required) Install a digital reference sensor Cable-connect the sensor paths with the processing unit (PU) Cable-connect the digital reference sensor with the PU Commissioning incl. configuration The Installation in Detail Back to PHS Forward to Monitoring